1 00:00:09,650 --> 00:00:07,460 well NASA has a long history using 2 00:00:11,660 --> 00:00:09,660 barges but specifically Pegasus was 3 00:00:13,850 --> 00:00:11,670 built to support the transportation of 4 00:00:16,189 --> 00:00:13,860 the external tank for shuttle from 5 00:00:18,890 --> 00:00:16,199 Massoud assembly facility over to 6 00:00:22,670 --> 00:00:18,900 Kennedy Space Center the NASA Pegasus 7 00:00:25,189 --> 00:00:22,680 barge is a NASA asset we've had it since 8 00:00:26,720 --> 00:00:25,199 about the year 2000 when the 9 00:00:29,240 --> 00:00:26,730 requirements first came down from the 10 00:00:31,310 --> 00:00:29,250 Space Launch System and the big core 11 00:00:32,780 --> 00:00:31,320 stage it was obvious that we had to do 12 00:00:35,479 --> 00:00:32,790 something with our barge should be able 13 00:00:38,360 --> 00:00:35,489 to transport it so we've had to actually 14 00:00:41,150 --> 00:00:38,370 extend the barge by 50 feet because of 15 00:00:43,369 --> 00:00:41,160 the added weight and added length of the 16 00:00:44,990 --> 00:00:43,379 course stage over the external tank so 17 00:00:47,299 --> 00:00:45,000 we we've really saved about eight 18 00:00:49,700 --> 00:00:47,309 million dollars modifying the current 19 00:00:52,420 --> 00:00:49,710 barge versus going out and building a 20 00:00:55,939 --> 00:00:52,430 brand new barge Pegasus came to us 21 00:00:58,279 --> 00:00:55,949 needing to be lengthened we fabricated a 22 00:01:00,619 --> 00:00:58,289 hundred and sixty-five foot long plug 23 00:01:03,410 --> 00:01:00,629 section for the middle of the vessel we 24 00:01:06,140 --> 00:01:03,420 had the vessel retrieved two at our 25 00:01:07,940 --> 00:01:06,150 facility we put it up on JA dock we cut 26 00:01:10,280 --> 00:01:07,950 the vessel in half inserted the new 27 00:01:13,700 --> 00:01:10,290 section removed an old section and 28 00:01:15,679 --> 00:01:13,710 reattached all and all the structural 29 00:01:18,710 --> 00:01:15,689 systems all the mechanical systems all 30 00:01:20,960 --> 00:01:18,720 the electrical systems upgraded some of 31 00:01:24,260 --> 00:01:20,970 the generator power the switchboards 32 00:01:26,179 --> 00:01:24,270 main control centers so if we've we've 33 00:01:28,520 --> 00:01:26,189 done quite a bit of work to it so it's 34 00:01:31,670 --> 00:01:28,530 mission for the SLS core stage will be 35 00:01:34,010 --> 00:01:31,680 very similar shipping routes the way 36 00:01:37,429 --> 00:01:34,020 that we you know installed the the cargo 37 00:01:39,469 --> 00:01:37,439 all that is very similar to the external 38 00:01:41,420 --> 00:01:39,479 tank so we have the experience and the 39 00:01:44,690 --> 00:01:41,430 database to help us for with the core 40 00:01:46,670 --> 00:01:44,700 stage in modifying Pegasus we had to 41 00:01:48,590 --> 00:01:46,680 deal with a significant way to increase 42 00:01:49,999 --> 00:01:48,600 the external tank system weight 43 00:01:52,910 --> 00:01:50,009 approximately one hundred and thirty six 44 00:01:54,469 --> 00:01:52,920 thousand pounds for SLS core stage we 45 00:01:57,170 --> 00:01:54,479 have to accommodate approximately eight 46 00:01:59,480 --> 00:01:57,180 hundred thousand pounds and in fact it's